You are planning a new VLAN-based network solution.
What is one item you should consider when creating your implementation plan as it concerns VLANs?()
A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and configured
C.administrator assignments
D.rollback plan
您可能感興趣的試卷
你可能感興趣的試題
A.default VLAN information for all unused switch ports
B.802.1x configuration parameters
C.number of IP subnets needed
D.IP routing protocol information
During testing of network redundancy in a fully meshed enterprise campus, a problem has been reported. Both distribution multilayer switches are fully configured for redundancy; clients operate normally when the primary multilayer distribution switch is operating. All clients drop connections outside of their respective access layer group when the primary distribution switch is shut down and the secondary distribution switch is still operational. Additional information indicates that the secondary distribution switch is able to ping major corporate and Internet locations.
Which item would be the best point of troubleshooting for this connectivity issue? ()
A.client network configuration
B.VLAN mapping
C.inter-switch trunk configuration
D.UDLD configuration
E.first-hop redundancy protocol
A.aaa port-auth enable
B.radius port-control enable
C.dot1x system-auth-control
D.switchport aaa-control enable
A.The port is configured for both data and voice traffic.
B.The port is fully dedicated to forwarding voice traffic.
C.The port will operate as an FXS telephony port.
D.Voice traffic will be redirected to VLAN 222.
A remote host can be pinged from all switches except one.
Which of the following is the most likely reason for this failure?()
A.VTP pruning has isolated the switch.
B.IP routing is disabled on the switch.
C.PoE is failing on the remote port.
D.There is a loop in the topology.
最新試題
Refer to the exhibit. The command switchport mode access is issued on interface FastEthernet0/13 on switch CAT1. What will be the result?()
Which router redundancy protocol cannot be configured for interface tracking?()
During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()
Refer to the exhibit. For what purpose is the command show ip cef used?()
During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group. What can be done to make the group function properly ? ()
What must be the same to make multiple switches part of the same Multiple Spanning Tree (MST)?()
How are STP timers and state transitions affected when a topology change occurs in an STP environment?()
Refer to the exhibit. Which Virtual Router Redundancy Protocol (VRRP) statement is true about the roles of the master virtual router and the backup virtual router?()
Examine the diagram. A network administrator has recently installed the above switched network using 3550s and would like to control the selection of the root bridge.Which switch should theadministrator configure as the root bridge and which configuration command must theadministrator enter to accomplish this?()
Refer to the exhibit. Which statement is true about the output?()