You work as a network technician at Certkiller .com. Please study the exhibit carefully. All of the computing devices shown are on the same logical network, as if they were all connected to the same switch. Which two features make this possible?()
A.PAT
B.802.1Q
C.Spanning-tree
D.VLANs
E.QoS
您可能感興趣的試卷
你可能感興趣的試題
A.1 Catalyst Express 500G-12TC,1 Catalyst 3750G-12S-S
B.1 Catalyst 3750G-12S-S,1 Catalyst Express 500-24PC
C.2 Catalyst Express 500G-12TC
D.2 Catalyst 3750G-12S-S,1 Catalyst Express 500-24PC
E.2 Catalyst Express 500-24PC
F.2 Catalyst 3750G-12S-S
A.Low Latency
B.Best-Effort
C.Guaranteed Quality
D.Guaranteed Bandwidth
You work as a network technician at Certkiller .com. Please study the exhibit carefully. Which three of these are accurate description of values that you will find in the verified column for different types of products?()
A.If the solution is configured and orderable, a check mark will be displayed.
B.If the configuration is incomplete, the words "Not Configured" will be displayed
C.If the part is a non-configurable part, the words "Not configurable" will be displayed
D.If the solution is not orderable, a check mark will be displayed
E.If the configuration is complete, the word Done will be displayed
F.If the solution is not configured, a check mark will be displayed
A.RIP
B.EIGRP
C.OSPF
D.Static and default routes
最新試題
During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()
When enabling IPS on an ISR using the Cisco SDM IPS Wizard, in what location can the SDF be placed?()
Which three of these pre-requisite for resetting a Catalyst Express 500 switch when Cisco Network Assistant is unavailable?()
In an environment in which multiple VLANs have been defined on Catalyst Express 500 switches, which two statements are correct for ports that have been configured with the Smartport role of "IP Phone + Desktop"?()
When determining a customer’s security requirements using the security site survey from the steps for success methodology, which three of theses should be included in the customer’s security policy and procedures?()
During which phase of the steps to success methodology for Cisco SMB security solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which, if any, modification should be made prior to implementation?()
You work as a network technician at Certkiller .com. Please study the exhibit carefully. From this Cisco SDM security Audit Wizard screen, what should you do to secure the Router?()
You work as a network technician at Certkiller .com. Your boss, Mrs. Certkiller, is interested in port types. Match the appropriate port type with the correct function.
What is the reason for running spanning-tree in a Cisco Single-Site Secure Network Foundation Solution?()
Which two WAN access methods are specified for a simplified and cost-effective Cisco Single-Site Secure Network Foundation Deployment Design?()