A.Power 710
B.Power 720
C.Power 730
D.Power 740
您可能感興趣的試卷
你可能感興趣的試題
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer.
Which of the following must also be ordered?()
A.A second IVE adapter
B.A second processor card
C.PowerVM Enterprise Edition
D.An additional cable-management arm
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.
Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
A.Order a 2-port 1Gbps Ethernet LAN adapter.
B.Order a 2-port 10Gbps Ethernet LAN adapter.
C.Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.
D.Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.
A.1, 2, or 4
B.2, 4, or 6
C.2, 4, or 8
D.4, 6, or 8
A.Power 730
B.PS700 Blades
C.PS702 Blades
D.PS703 Blades
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.
Which Blade is designed for Windows workloads?()
A.HS22
B.JS43
C.QS21
D.PS701
最新試題
Which of the following uses compression/decompression to increase the memory available for client workloads?()
A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()
A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.How can they manage the new machines for the least cost?()