When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines.
What is recommended to resolve this situation?()
A.Upgrade to VMControl Standard Edition
B.Upgrade to VMControl Enterprise Edition
C.Upgrade to latest version of VMControl Express Edition
D.Download the latest fixes for VMControl Express Edition
您可能感興趣的試卷
你可能感興趣的試題
A.Manage multiple operating systems on a server
B.Manage energy consumption and network traffic to increase efficiency
C.Manage LPARs, operating systems and servers to reduce administration
D.Manage workloads across multiple servers to optimize resource utilization
A customer is considering procuring HP servers with Virtual Server Environment (VSE) to consolidate servers and dynamically move resources between partitions.
How can the technical sales representative position PowerVM as the solution to virtualize this server environment?()
A.PowerVM supports shared servers compared to VSE
B.PowerVM supports shared processors and memory compared to VSE
C.PowerVM supports shared processors, memory and I/O compared to VSE
D.PowerVM supports DLPAR without a reboot and supports dedicated I/O compared to VSE
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used.
Which of the following fulfills the customer requirements?()
A.Two dual-port PCIe adapters
B.A four-port PCIe Ethernet adapter
C.Four separate PCIe Ethernet adapters
D.Two embedded Integrated Virtual Ethernet adapters (IVE)
A.PCIe adapters are supported only in I/O drawers
B.PCI-X adapters are supported in both the CEC and in I/O drawers
C.PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawers
D.PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers
最新試題
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()
Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()
A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()