You have just created a new VLAN on your network.
 What is one step that  you should include in your VLAN based implementation and verification plan? ()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command. 
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題What is a critical piece of information that you should have when creating a VLAN-based implementation plan?()

A.approval from senior management
B.end-user requirements
C.IEEE 802.1X authentication parameters
D.a summary implementation plan

2.單項選擇題When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()

A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.

3.單項選擇題

You are planning a new VLAN-based network solution. 
What is one item you should consider when creating your implementation plan as it concerns VLANs?()

A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and  configured
C.administrator assignments
D.rollback plan

4.單項選擇題What network information do you need when you plan to implement a VLAN-based solution?()

A.default VLAN information for all unused switch ports
B.802.1x configuration parameters 
C.number of IP subnets needed
D.IP routing protocol information

最新試題

During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()

題型:單項選擇題

Refer to the exhibit. For what purpose is the command show ip cef used?()

題型:單項選擇題

Based on the show spanning-tree vlan 200 output shown in the exhibit, which two statements about the STP process for VLAN 200 are true? ()

題型:多項選擇題

Refer to the exhibit. Based on the output of the show spanning-tree command, which statement is true? ()

題型:單項選擇題

Refer to the exhibit. The command switchport mode access is issued on interface FastEthernet0/13 on switch CAT1. What will be the result?()

題型:單項選擇題

Refer to the exhibit. Which statement is true about the output?()

題型:單項選擇題

Which option correctly identifies the Cisco IOS switching methods in descending order from the fastest method to the slowest method?()

題型:單項選擇題

What will occur when a nonedge switch port that is configured for Rapid Spanning Tree does not receive a BPDU from its neighbor for three consecutive hello time intervals?()

題型:單項選擇題

Which three statements about STP timers are true?()

題型:多項選擇題

During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group. What can be done to make the group function properly ? ()

題型:單項選擇題