單項選擇題

A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.
Which action will reduce the potential vendor software costs?()

A.Create capped partitions for the database servers.
B.Create workload partitions for the database servers.
C.Create a separate shared processor pool for the database servers.
D.Create virtual processors equal to the entitlement for database servers.


您可能感興趣的試卷

你可能感興趣的試題

2.單項選擇題

A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV).
Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()

A.LPAR-A with 1Gb FC HBA and SAN connection
B.LPAR-B with 2Gb FC HBA and SAN connection
C.LPAR-C with 4Gb FC HBA and SAN connection
D.LPAR-D with 8Gb FC HBA and SAN connection

3.單項選擇題

A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing.
What action, or sequence of actions, will immediately and permanently solve this problem?()

A.Add or remove the resources in the profile, click 'apply', then 'save'.
B.Add or remove the resources using DLPAR and change the partition profile.
C.Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.
D.Add or remove the resources in the system profile and reboot the managed system.

最新試題

A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()

題型:單項選擇題

A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.Which configuration will provide boot disk capability to all partitions?()

題型:單項選擇題

A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()

題型:單項選擇題

A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.Which action will reduce the potential vendor software costs?()

題型:單項選擇題

Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()

題型:單項選擇題

Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()

題型:單項選擇題

Which of the following uses compression/decompression to increase the memory available for client workloads?()

題型:單項選擇題

A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()

題型:單項選擇題

A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()

題型:單項選擇題

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional  hardware?()