A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()
A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
广告位招租 联系QQ:5245112(WX同号)
关于我们 | 付款方式 | 广告联系 | 联系我们 | 网站地图 | 网站申明 | 友情链接 | 网站招聘 | 帮助中心
版权所有©考试资料网(ppkao.com) 长沙求知信息技术有限公司 All Rights Reserved
扫一扫免费做题